Flood level
Flood level can be defined as the height reached by a body of water (such as a stream or river) resulting from overflow beyond its normal limits.
A high flood level is the maximum level to which a body of water could rise due to rainwater and runoff during a flooding event. High flood level calculations take into account local conservation or reclamation efforts supported by artificially constructed measures such as water storage tanks. High flood level information for a specific site can be used for planning purposes to help determine a design flood level.
A design flood level is defined in Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018. It is described as a historic or notional flood event of a given annual probability, against which the suitability of a proposed development is assessed and mitigation measures, if any, are designed to accommodate a storm event. This includes an allowance for climate change in line with current best practice national planning guidance.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
















